Westbound I-20 lane closure for bridge work begins today

November 12, 2012

Both main lanes of westbound Interstate 20 at the US 84 overpass in Nolan County are scheduled for a temporary closure for preliminary work to replace the bridge that was damaged after a collision in late September.
Westbound Interstate 20 will be closed the week of Monday, Nov. 12. Traffic will be detoured to US 84 Business and routed around the overpass before being directed back to westbound I-20. The three-quarter mile detour is the same route that was used immediately following the collision. Signs, cones and message boards will be in place to direct drivers.
The inside lane of Interstate 20 will reopen after about a week. The outside lane will remain closed until further notice.

MONDAY, JAN. 26 Sweetwater 7th and 8th grade ‘A’ and ‘B’ girls will host Lamesa, 5 and 6:15 p.m....
BIG SPRING — The Sweetwater girls basketball team managed to stay close in the first half against...
BIG SPRING — A one-point lead at halftime disappeared for Sweetwater when it played at Big Spring...

 

Premium Drupal Themes by Adaptivethemes